Re-Consultation: Revised access details and additional information regarding changes to batch building, 19th December 2023:
- Dragon-ARUP-HWAY-GF-DR-H-100030
- CiNER Dragon Glass – Note Batch Building Revised
- Public Notice dated 28 December 2023
RVC Application – C/2023/0209 - Application to vary condition 3 (approved plans & documents) and remove condition 33 (great crested newts) of planning permission C/2021/0278 (Construction and operation of a purpose-built glass manufacturing facility, and associated development)
The following key documents have been submitted to accompany planning application C/2023/0209.Ěý Full details of the application can be made available for inspection by prior appointment by contacting 01495 364847 or email planning@blaenau-gwent.gov.uk
- Planning Application Form
- S73 Cover Letter
- S73 Cover Letter 2
- ES Addendum Final Issue 1
- ES Addendum Final Issue 2
- ES Addendum Non Technical Summary
- S73 Planning Design and Access Statement
- Existing Site Location Plan
- General Context Site Layout Plan Proposed
- General Arrangement Plan
- Process Buildings North East South West GA Elevations
- Batch Building North East South West Elevations
- Substation & Security Buildings North South East West Elevations
- Cullet Buildings North East South West Elevations
- LPG, RMS & Pump House North East South West Elevations
- Warehouse Building South East & West GA Elevations
- Site Notice
Original Application for – C/2021/0278 - Construction and operation of a purpose-built glass manufacturing facility, and associated development:
The following documents have been submitted to accompany planning application C/2021/0278.
Any representations must be submitted toĚýplanning@blaenau-gwent.gov.uk or in writing to General Offices, Steelworks Road, Ebbw Vale NP23 6DN by 16th May 2022.
Please note that all postal correspondence must be sent via Royal Mail.
New and Additional Information (April 2022)
Updated Documents
- Environmental Volume I Issue R02
- Environmental Statement Volume II Issue R02 Appendix A-C
- Environmental Statement Volume II Issue R02 Appendix D - F
- Environmental Statement Volume II Issue R02 Appendix G - I
- Environmental Statement Volume III Figures Issue R01
- Planning Statement Issue 4 April 2022
- Great Crested Newt Strategy Issue 3
January 2022 Documents
New Documents
- Site Traffic Management Plan
- Transport Statement Clarifications Note
- Energy Statement
- Air Quality Clarifications Note
- Response to public comments on the planning application
Updated Documents
- Environmental Statement (Volume 1)
- Environmental Statement (Volume 4)
- Environmental Statement (Volume 4) Welsh
- GCN Strategy
Updated Plans
Environmental Statements
- Environmental Statement Volume I
- Environmental Statement Volume II Appendices
- Environmental Statement Volume III Figures
- Environmental Statement Volume IV - Non Technical Summary
- Environmental Statement Volume IV - Non Technical Summary (Welsh)
Related Documents
- Application Form
- Bay Ecology Bat Report
- Proposed Drainage
- Drainage Strategy Report
- Arboriculture Survey
- GCN Conservation Strategy
- Planning Statement
- PAC Report
- Transport Statement
- Proposed Earthworks and Formation Levels
- Geotechnical and Geo-environmental DBA
- Highway General Arrangement
- External Highway Improvements
- Swept Path Analysis: 1 of 2
- Swept Path Analysis: 2 of 2
- Proposed Highway Long Sections: Sheet 1
- Proposed Highway Long Sections: Sheet 2
- Proposed Construction Finishes
- Proposed Finished Levels
- Proposed Cross Sections
- Proposed Retaining Wall Long and Cross Sections: Sheet 1
- Plan and Section Relating to Wind Turbine
- Proposed Retaining Wall Long and Cross Sections: Sheet 2
- Site Clearance
- Existing Services
- Combined Services Co-ordinated Layout
- Process Buildings Level 01 General Arrangement Plan
- Process Buildings Level 02 General Arrangement Plan
- Process Buildings Level 03 General Arrangement Plan
- Process Buildings Level 01 General Arrangement Plan
- Process Buildings Level 02 General Arrangement Plan
- Process Buildings Level 00 General Arrangement Plan
- Process Buildings Roof General Arrangement Plan
- Outline Landscape Management Strategy
- Site Layout Plan - Existing
- Site Layout Plan - Proposed
- Hard and Soft Landscape Plan - Proposed
- Process Buildings East - West General Arrangement Section
- Process Buildings North - South General Arrangement Section
- Process Building North East South West General Arrangement Elevations
- Utilities Building North South East General Arrangement Elevations
- Batch Building North East South West General Arrangement Elevations
- Substation and Security Buildings North East South West General Arrangement Elevations
- Cullet and Filter Buildings North EastSouth West General Arrangement Elevations
- RMS-C, LPG, Waste Buildings North East South West General Arrangement Elevations
- Warehouse Building South East West General Arrangement Elevations
- Existing Site Layout
- Design and Access Statement
- Materiality and Lighting Considerations